Skip to content

Search RFP.co

Pages across the product, solutions, opportunities and resources.

Type to search. Press Enter to open the full results page.

Start free trial
For buyers

Put a manufacturing project out to bid

Describe what you need made — the part, the process, the volumes and what a supplier has to prove — and we turn it into an RFP that shops can quote from.

Most manufacturing quotes come back incomparable because the briefs behind them were. One shop prices the tooling, another amortizes it; one assumes standard tolerances, another reads the drawing. The questions below are the ones that decide whether a shop can bid at all — process, volume, tolerance, certifications and who owns the tooling — asked once, in the order somebody who has run a sourcing exercise thinks about them.

What you need made

What you would call this internally. It becomes the title of the RFP.

Manufacturing processes (required)

Everything that might apply. A supplier reads this first to decide whether to bid at all.

What it does, where it goes, what it has to survive, and anything that has already gone wrong with it. This is the part suppliers quote from.

Nothing is uploaded here. Drawings are exchanged after an NDA if you need one.

Materials and specification

Materials

6061-T6, 316L, PA66 GF30 — if it is specified, name it.

The tightest single feature, not the drawing default.

Finishing and secondary operations

Volume and schedule

Units a year, at the rate you expect to settle at.

Suppliers quote better when the deadline is real and stated.

Quality and compliance

Certifications a supplier must hold

Only what is genuinely required. Every certification narrows the field, and a requirement nobody checks costs you bidders for nothing.

Inspection and documentation

What has to arrive with the parts.

Supplier preferences

Where suppliers may be
Supplier preferences

Set-asides and diversity requirements, and whoever you already work with.

Who pays for it and who owns it is the question that most often reopens a quote.

Commercial terms

A range is enough. It is not shown to suppliers.

City and country is enough at this stage.

Anything a supplier has to accept that is not negotiable, and anything that is.

About you

Where you want help

We reply to the address you give, and use it for nothing else. Nothing here is shown to a supplier until you say so.

Questions people ask before sending one

What does it cost to send a manufacturing project out to bid?

Submitting a brief and having it turned into an RFP costs nothing, and there is no obligation to award. RFP.co is paid by the companies that use the platform to manage their own bidding, not by charging buyers to publish a requirement.

How much detail do I need before I can start?

Enough to describe the part, the process and roughly how many you need a year. Drawings, tolerances, certifications and commercial terms all help, and every one of them is optional — a project at the concept stage is a normal thing to send, and the missing answers are what the first conversation is for.

Do I have to upload drawings or CAD files?

No, and the form deliberately does not accept them. Drawings are exchanged directly once you know who is looking at them, after an NDA if you asked for one. Nothing you send here is shown to a supplier until you approve it.

What is the difference between an RFQ and an RFP for manufacturing?

An RFQ asks for a price against a specification you have already fixed — the part is defined and what you want back is a number. An RFP asks a supplier how they would approach the work, which is the right instrument when the design, the process or the tooling arrangement is still open. Most manufacturing sourcing starts as an RFP and narrows to an RFQ once the specification settles.

How many suppliers should I invite to quote?

Three gives you a comparison, five gives you a market. Beyond about ten the returns fall off sharply and the evaluation cost rises, because every additional quote is another package to normalize before it can be compared to the others.

How long does it take to get quotes back?

For a well-specified machined or fabricated part, one to three weeks is typical. Tooled processes — injection moulding, die casting, stamping — run longer, because the supplier is quoting a tool as well as a piece price and usually wants a design-for-manufacture review before committing to either.

Can I use this to second-source a part I already buy?

Yes, and it is one of the most common reasons people send a brief. Say so under stage, and name the certifications and inspection documentation your current supplier provides — matching those is what makes a second source a real alternative rather than a cheaper quote you cannot act on.